Sinfonia Varsovia Concert Hall
The objective of the Competition is to indicate the best design of Warsaw’s new
cultural centre related to Orkiestra Sinfonia Varsovia. The new centre will not only be an
attractive place to present classical music and other genres of art, but also a place where
to spend free time.
The maximal planned joint costs of performing the works effected on the basis of
the Competition entry should not exceed gross EUR 110 million. These costs include total
costs of construction works connected with the effecting of the engineering structure
made on the basis of the architectural design developed in the scope of the post-
Competition public procurement procedures. These costs include in particular the costs of
erecting and adaptation of engineering structures, their comprehensive equipment as well
as the costs of the works related to land development.